AC Drive Wiring
‑21‑
Figure 5‑2 Control circuit wiring
5.4 Post-wiring Inspection
After wiring is completed, check the following items and tick compliant items.
Table 5–2 Post‑wiring inspection checklist
No. Item
Checked
1
The power supply input cables are connected to the R, S, and T
terminals (three‑phase 380 V) or L1 and L2 terminals (single‑phase
220 V).
2
The motor input cables are connected to the U, V, and W terminals.
3
The dimensions of the main circuit cables meet the requirements.
4
Heat‑shrink tubes are applied to cable lug copper pipes and
conductors of main circuit cables, and completely cover the cable
conductors.