EasyManuals Logo

Interlogix advisorone User Manual

Interlogix advisorone
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #81 background imageLoading...
Page #81 background image
81 Contents Index AdvisorOne User Manual 1.9.x 466-4421 • REV A • ISS 14APR2016 ©2016 United Technologies Corporation
Reporting
The panel may be configured to report to multiple destinations. Each destination should
be tested to be sure the communication is in working order.
1. Depending on the situation, it may be necessary to contact the central monitoring
station before starting the installation.
2. From the Configuration & Programming screen, press TEST.
3. Press REPORTING.
4. Press CALL next to the destination to test communication (Figure 73).
Figure 73: Reporting Destination Test
5. From the Test Call screen, press START to initiate a test call to the destination
(Figure 74).
Figure 74: Test Call
If the test is successful, the screen displays Report Delivered (Figure 75).

Other manuals for Interlogix advisorone

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Interlogix advisorone and is the answer not in the manual?

Interlogix advisorone Specifications

General IconGeneral
BrandInterlogix
Modeladvisorone
CategorySecurity Sensors
LanguageEnglish

Related product manuals