Operations introduction 
  Copyright © Itech Electronic Co., Ltd.  42 
>High    Range 
Low    Range 
5.  Press key to enter the current setting <Iset>, such as set the current 
to be 1.25A,press    key to confirm. If any error, press Esc to back.   
CH01 
Const    Current 
Set= 1.25A 
Enter            Esc 
6.  Press key to enter the maximum voltage value setting, press . 
Press numeric key to set the maximum voltage value. 
CH01 
Voltage Upper 
Limit=82.000V 
Enter          Esc 
7.  Press key to enter the minimum voltage value setting, press . 
Press numeric key to set the minimum voltage value. 
CH01 
Voltage Lower 
Limit=0.000V 
Enter          Esc 
8.  Press    key to enter the rise slope setting, such as set the rise slope 
to be 1A/uS. Press    key to confirm 
CH01 
Rise Speed Set 
= 1.00A/uS 
Enter          Esc 
9.  Press    key to enter the fall slope setting, such as set the fall slope 
to be 2A/uS. Press    key to confirm 
CH01 
Fall Speed Set 
= 2.00A/uS 
Enter          Esc 
10.  Press    key to exit 
11.  Press    to open the load’s input 
CH1    CC    ON 
Vdc=0.0000V 
Adc=0.0000A 
Wdc=0.00W 
4.4 Transient operation 
Transient operation enables the module to periodically switch between two load 
levels, as might be required for testing power supplies. Transient operation can 
be turned on and off at the front panel ( and keys), before you turn 
on  the  operation,  you  should  set  the  parameters  associated  with  transient 
operation ( ). The parameters include: A level, A width, B level, B width, 
and transient testing modes. 
The transient testing modes have 3 kinds: continuous, pulsed, or toggled.   
⚫  Continuous: Generates a respective pulse stream the toggles between two 
load levels 
⚫  Pulse: Generates a load change that returns to its original state after some