• Providing all required tools, equipment and capable field crews that are required to
properly install Itron network devices, including modern Clamp-on ground testing
equipment.
Note Supplier is responsible for ensuring all Supplier managed field crews meet any
local labor and / or pay requirements, such as union requirements, Local Business,
mandatory minimum "Living Wages", as may be required.
• Include the expected equipment and costs associated with performing grounding
testing, per the current version of the Itron Grounding Specifications.
• Compiling a package of as-built and closeout documentation in a compact electronic
format (Adobe .pdf files preferred) and e-mailing each site package to the Itron PM
development within 3 business days following each completion.