Symbols & Numbers
A
AC
installation diagram • 38
mains power • 13
service requirements • 9
tower installation diagram • 44
angles
azimuth • 47
tilt • 47
Antenna Line Sweeps Procedure • 81
antennas • 3, 4, 10, 12, 20, 72
900 MHz • 4, 10, 14, 20, 60, 72
GPS • 3, 8, 15, 20, 60
grounding • 10
high gain • 15
placement • 10
specifications • 60
WAN • 3, 8, 15, 20, 60
arrays • 45
azimuth • 47
B
battery
battery pack • 62
calendar life • 55
charging • 54
installing • 34
maintenance • 56
replacing • 56
shipping requirements • 53
storage • 53
brackets • 16, 22
C
CCUs
configuration • 1
davit arm mount • 28
installation profiles • 7
installing • 19
mounting hardware • 16, 22
pipe mount • 23
pole mount • 25
power operating range • 62
siting • 7
specifications • 57
wall mount • 27
charging • 53
coaxial cable • 14
components • 1
connecting cables • 9, 12, 14, 16, 29
connectors • 16
D
davit arm mount • 28
diagrams
AC installation • 38
AC tower installation • 44
solar installation example • 50
solar wiring example • 46
dimensions • 57
E
endpoint antenna • 4, 10, 20, 60
environmental specifications • 61
Ethernet connections • 9
F
ferrite bead • 36
G
GPS
antenna • 3, 10, 20
coverage • 8
grounding • 10, 12, 93
Grounding Specifications Procedure • 93
H
hardware • 14, 16, 22
I
ICS • 9, 19, 39
initial collector setup • 9, 19, 39
installation profiles • 7
TDC-0971-011 CCU 100 and Repeater 100 Installation Guide 125
Proprietary and Confidential