Channel allocation must be predefined in software configuration tool (ACE Pilot) according to the following rules
for Max Demand (5 rates maximum):
Channel 1: A+
Channel 2: A-
Channel 3: Summation 1
Channel 4: Summation 2
The last configured rate for the max demand channel is reserved for the total max demand data.
The channel 3 and the channel 4 are defined with summation in order to be able to have different definition of R+
and R-.
By default:
Summation 1 = Q1 + Q4
Summation 2 = Q2 + Q3
For the TotalEnergy, there is no specific configuration, except the ratio of each summation.
The Excess demand must be predefined in software configuration tool (ACE Pilot) according to the following
rules:
Channel 1: A+