EasyManua.ls Logo

IVT 495 TWIN - Installer Ground Coil and Commissioning; Ground Coil Installation Details

IVT 495 TWIN
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
40
IVT 495 TWIN 9518799
Ground coil
The collector hose is a thin-walled hose PEM 40 x 2.4 PN 6.3 or PEM 40 PN 10. It is important that the
filling around the ground coil does not contain stones or other objects that could damage the hose. The
final filling is best carried out after the ground collector has been tested. Avoid fillings or dirt getting into
the coil when cutting.
Installation and filling around the collector hose must comply with local regulations.
Bending diameter
Minimum permitted bending diameter is 1 metre. Always use an elbow coupling for sharper bends. If you
damage the hose by bending it too much you can repair it with a straight coupling.
IVT 495 TWIN
Ground coilHeat pump Bore depth
Ground coil
150 metres
50 metres
*) The hose length must be increased for exhaust airflows less than 120m³/h,
contact IVT for further information. Max hose length is 400m.
Minimum distance between hose and house: 1.5m
The hoses must be insulated over the final 1.5m towards the
house foundation to avoid frost movements.
Filling must be carried out according to local regulations.
The filling must not contain stones or other objects that could
damage the hoses.
Finished ground level
Refilling with
existing soil
Collector hose 150 m
Type PEM 40 x 2.4 PN 6.3.
INSTALLER

Table of Contents

Related product manuals