EasyManua.ls Logo

IVT Greenline HC 22 - Page 54

IVT Greenline HC 22
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Menu overview
6 720 645 504 (2011/04) en
54
Operating times and con-
sumptions
The total operating time for the compres-
sor and additional heat (active connec-
tion). It can also make short term
measurements.
1
Temperatures All connected/acknowledged sensors
present values. The opportunity to cor-
rect the sensors is also given
1
Inputs The status of all connected inputs is dis-
played here. Pressure switches and
motor cut-outs are shown for each heat
pump
1
Outputs All components can be manually oper-
ated individually here to check function
1
Circulation pumps Operation alternative heating circuit
pump G1
1
Operation alternative heat carrier pump
G2
1
Operation alternative collector circuit
pump G3
1
Screed drying Activate 1
Current program step
1
Remaining time for current step
1
Heat source
1
Program settings
Flow temperature increase per heating
step
Number of days per heating step
Maximum flow temperature
Number of days with maximum tempera-
ture
Flow temperature decrease per cooling
step
Number of days per cooling step
1
1
1
1
1
1
Installer
Access
level
Tab. 34 Installer menus

Table of Contents

Related product manuals