i
REVISION/
PAGE
REVISION
DATE
MADE
BY
APPLICABLE
ECN
DETAILS
A 05-02-07 MAW N/A Release to production.
B 05-22-07 JDD 7920 Changed schematics to new color scheme
29 08-06-07 MAW 7930 Updated AvengerHT Incoming plumbing assembly.
C 10-07-07 MAW PROCESS Added Avenger LTH designation. Added 480 Volt Avenger HT.
11-20-07 MAW Process Corrected 480 Volt Avenger HT components.
PG 47 & 48 01-31-08 MAW Process
Updated installation instructions. Replaced LTH with LT designa-
tion. Added vacuum switch assembly.