7. GREASING
7. GREASING
After every 8 hours of operation or once a day, the following must be greased:
3 Rotor bearings 2
13 Chains (grease with thin oil/chain saw oil) 8
2 Transmission shaft at rotor 2
4 Lateral steering (with grease) 1
After every 50 hours of operation or once a week, the following must be
greased:
1 Universal joints on PTO shafts 4
6 Freewheel 1
18 Profile tubes on PTO shafts 3
7 Feed rollers 8
5 Bearings for tube in the pick-up 2
17 Swivel chute 4
8 Grinding device 1
9 Support rollers 3
14 Link bearings in rocker arms 2
10 Bearing housing 4
11 Couplings 3
19 Alternative pin for transmission shaft at rotor (grinding/blocking) 1
12 Steering device for grindstone (rust-preventing oil) 2
After every 500 hours of operation or once a year, the following must be
greased:
16 Support arm for pick-up 2
15 Bevel gear box:
• Oil type: Quality EP SAE 90 GL4/GL5
• Oil content:
PTO 540 PTO 1000
2.5 L 2.5 L
• Oil change: After the first 10 working hours and then once a year.
PIGB-138X-02 FC 855 0410
- 55 -