210.100-IOM (JUL 2021)
Page 27
AcuAir Hygienic Air Units
Installation
ATTACH REMAINING HOODS
TO THIS SIDE IF NECESSARY
WEATHER HOODS WILL ARRIVE ATTACHED TO ONE SIDE OF THE OA BOX.
IF SHIPPING SIZE ALLOWS, OA BOX WILL BE FULLY ASSEMBLED.
IF NOT COMPLETELY ASSEMBLED, THE SHIPPED LOOSE HOODS WILL HAVE
BEEN TEST FITTED AND SOME SCREW HOLES WILL REMAIN AS A GUIDE.
THIS SIDE IS OPEN AND ATTACHED TO UNIT HOUSING WALL.
HOLES ARE PRE-DRILLED IN THE OA BOX SUPPORTS TO ATTACH TO THE UNIT HOUSING.
SCREWS ARE PROVIDED IN THE UNIT SHIP LOOSE PARTS TO ATTACH THE HOODS AND
THE OA BOX TO THE UNIT.
THIS SIDE WILL HAVE SOLID COVERS.
AN ACCESS PANEL IS IN ONE COVER TO
ALLOW ENTRY INTO OA BOX TO AID IN
ATTACHMENT TO THE UNIT HOUSING.
SLOPING ROOF PANELS
HAVE BEEN REMOVED FOR CLARITY
O/A OPENING
O/A HOOD
ALIGNMENT GUIDES
(12 GA. GALV.)
*THIS ASSEMBLY
MAY BE MIRRORED
DEPENDING ON
UNIT HANDING
Figure 29: Plenum assembly positioning and alignment