EasyManua.ls Logo

Juniper QFX5200 - Page 112

Juniper QFX5200
216 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Decide whether the FRU end of the switch or the port end is to be placed at the front of the rack.
For airow in (AFI) installaons, posion the switch with the blue components next to the cold aisle
and for airow out (AFO) installaons, posion the switch with the red components next to the hot
aisle.
4. Align the holes in the front mounng bracket with the holes on the side of the chassis so that the
bracket is ush with the port panel. See Figure 39 on page 103.
Figure 39: Align the Front Mounng Bracket and Secure with Screws
5. Using a Phillips screwdriver, aach the front mounng bracket to the switch using four of the at
head screws in the holes closest to the port panel. Tighten the screws.
6. Repeat Steps 4 and 5 on the opposite side of the switch.
7. Align the holes in the adjustable mounng rail with the remaining holes in the chassis. The
alignment should permit two screws at mid-chassis and four screws nearest the power supplies.
The adjustable blades t standard racks between 22.05 in. (56 cm) to 29.5 in. (75 cm).
8. Aach the adjustable mounng rail to the chassis using the Phillips screwdriver and six of the at
head screws. Tighten the screws. See Figure 40 on page 103.
Figure 40: Align Holes for Mounng Rail and Aach with Screws
9. Repeat Steps 7 and 8 on the opposite side of the switch.
10. Have one person grasp both sides of the unit, li it, and posion it in the rack so that the front
mounng bracket is aligned with the rack holes.
103

Table of Contents

Related product manuals