Table 7: Site Preparation Checklist (continued)
DatePerformed byFor More InformationItem or Task
“Clearance Requirements for
Hardware Maintenance of
SSR120” on page 23
Verify that there is appropriate clearance in
your selected location.
Cables
Acquire cables and connectors:
•
Determine the number of cables needed
based on your planned configuration.
•
Review the maximum distance allowed
for each cable. Choose the length of cable
based on the distance between the
hardware components being connected.
Plan the cable routing and management.
SSR120 Site Guidelines and Requirements
IN THIS SECTION
General Site Installation Guidelines | 21
Site Electrical Wiring Guidelines | 21
Chassis Physical Specifications for SSR120 | 22
Environmental Requirements and Specifications for SSR120 | 22
Clearance Requirements for Hardware Maintenance of SSR120 | 23
Requirements for Mounting an SSR120 Appliance on a Desktop or Other Level Surface | 24
Rack Requirements for SSR120 | 24
20