EasyManua.ls Logo

Keysight Technologies N5191A - A20 Output Leveling Assembly

Keysight Technologies N5191A
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Keysight Agile Signal Generator Service Guide 125
Assembly Replacement
A20 Output Leveling Assembly
Tools Required
T-10 driver
5/16” open-ended wrench
Removal Procedure
1. For Option 520/52E instruments, refer to Figure 3-24.
For Option 540/54E instruments, refer to Figure 3-25.
For Option 520/52E 1EM instruments, refer to Figure 3-26.
For Option 540/54E 1EM instruments, refer to Figure 3-27.
For Option 520/52E AT1/AT2 instruments, refer to Figure 3-28.
For Option 540/54E AT1/AT2 instruments, refer to Figure 3-29.
For Option 520/52E AT1/AT2, 1EM instruments, refer to Figure 3-30.
For Option 540/54E AT1/AT2, 1EM instruments, refer to Figure 3-31.
2. Disconnect the semi-rigid cable (2) at the location shown. Disconnect the
RF out cable at the location indicated (3).
3. For instruments with Option AT1/AT2, unplug ribbon cables W31 and W32
at the locations indicated.
4. Remove the ten screws (1) (0515-0372) that attach the A20 Output
Leveling assembly to the deck. The Output Leveling assembly can now be
lifted from the deck.

Table of Contents

Other manuals for Keysight Technologies N5191A

Related product manuals