EasyManua.ls Logo

Keysight N8976B

Keysight N8976B
524 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
472 Keysight NFA Series Noise Figure Analyzers Service Guide
Post-Repair Procedures
Post-Repair Procedures
Post-Repair Procedures
Table 16-1 lists the adjustments and performance verification tests needed
after an assembly replacement.
After an assembly is replaced, find the assembly that has been replaced in the
left-hand column, and then perform the recommended adjustment and/or
performance verification test. Making the recommended adjustments and/or
performance verification tests doesn’t guarantee all published specifications
are being met. Only a full instrument calibration will do this.
The following procedures are also included in the Additional Tasks” on
page 476.
“Calibration Data Backup and Restore”
“BIOS Settings Verification
“Operating System Initialization”
“FPGA Synchronization
“Programming Model and Serial Numbers”
Refer to the analyzer user’s guide for information on instrument warm-up
before performing any of the procedures listed in this chapter.

Table of Contents

Other manuals for Keysight N8976B

Related product manuals