EasyManua.ls Logo

Kia G6DB-3.3 - INSTALLATION

Kia G6DB-3.3
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CYLINDER HEAD ASSEMBLY EMA -49
3. Install OCV(A).
Tightening torque
9.80 ~ 11.76Nm(1.0 ~ 1.2kgf.m, 7.23 ~ 8.68lb-ft)
A
KDR
F202A
NOTE
To i
nstall OCV with gray colored connector into
RH b
ank.
To i
nstall OCV with black colored connector into
LH b
ank.
CAUTION
Do not reuse the OCV when dropped.
Keep clean the OCV.
Do not hold the OCV sleeve during servicing.
When the OCV is installed on t he en gine, do
not move the engine with holding the OCV
yoke.
INSTALLATION E63A6A04
NOTE
Thoroughly clean all parts to be assembled.
Always use a new head and manifold gasket.
The cylinder head gasket is a metal gasket. Take
care not to bend it.
Rotate the crankshaft, set theNo.1 piston at TDC.
1. Install the cylinde r head.
a. The sealant locations on cylinder head and cylin-
der block must be free of engine oil and ETC.
b. Apply sealant on cylinder block top face before
assembling cylinder head gaskets.
The part must be assembled within 5 minutes
after sealant was applied.
15mm15mm
B
D
C
A
A
B
D
C
RH
BANK
LH
BANK
CYLNIDER
BLOCK
TOP FACE
(LH BANK)
CYLNIDER
BLOCK
TOP FACE
(RH BANK)
Engine Front Face
ECBF017A
www.CarGarage.ir
www.CarGarage.ir
www.CarGarage.ir

Table of Contents

Related product manuals