EasyManua.ls Logo

Kia G6DB-3.3 - INSTALLATION

Kia G6DB-3.3
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGINE AND TRANSAXLE ASSEMBLY EMA -21
INSTALLATION EAD5D6B1
Installation is in the reverse ord er of r emoval.
Perform the following :
Adjust the shift cable.
Refill the engine with engine oil.
Refill the transaxle with fluid.
Refill the radiator w ith engine coolant.
Bleed air from the cooling system with the heater
valve open.
Clean the batte ry posts and cable terminals with
sandpaper assemble them, then apply grease to
prevent corrosion.
Inspect for fuel leakage.
After assembling the fuel line, turn on the ignition
switch (do not operate the starter) so that the fuel
pump r uns for approximately two seconds and fuel
line pressurizes.
Repeat this operation two or three times, then check
for fue l leakage at any point in the fuel line.
www.CarGarage.ir
www.CarGarage.ir
www.CarGarage.ir

Table of Contents

Related product manuals