• It is recommended to install the product in a boiler room to prevent exhaust
gas from penetrating into the house.
• Secure sufficient space around the product to enable service and maintenance
work.
• Secure at least 60cm and 40cm of clearance from the wall and ceiling,
respectively.
• If the boiler cannot but be installed outdoor, provide a shelter and heat
insulation for freeze protection.
• Avoid outdoor installation which may cause freezing and/or bad combustion
due to wind or rainfall.
• Avoid the cold/hot air outlet of cooler/heater
• Air intake and exhaust tube (flue) must be provided for uninterrupted air feed
and exhaust.
• The floor under the boiler must be built with incombustible materials.
Fig. 3.1. Schematic view of boiler location
A Min. 60 cm from the ceiling D Boiler room air inlet
B Min. 40 cm from the wall E Boiler room wall
C Min. 5 cm of support (incombustible material) F Boiler room vent