6
FINAL ASSEMBLY ADJUSTMENTS AND
PRE-DELIVERY CHECK LIST
1. Check to make sure each ripper shank is located on desired row spacing and that all mounting bolts
are torqued properly.
2. Be sure jackstands are mounted securely with the bottom of the rear jackstands angled rearward.
3. Make certain that each coulter is centered directly in the middle of each ripper shank and mounting
bolts are torqued.
4. Check alignment and spacing of each pair of press wheels or tillage discs and make sure the ripper
shank will pass between them if the shank trips.
5. Make sure the safety reflectors are mounted correctly and located as near the ends of the tool bar as
possible.
6. If row markers are used, check to make sure they are assembled correctly (left marker on left end of
tool bar, right marker on right end of tool bar) and working freely.
7. If lift assist wheels are used, check to make sure they are assembled and mounted correctly with the
proper hydraulic connections.
8. Check gauge wheel and press wheel, and lift assist wheel tires for proper air inflation, and grease
all grease fittings.
9. Double check all nuts and bolts for proper torque.
10. Place this Operator’s Manual back in its waterproof bag and tie securely to the implement with the
open end down so that it won’t catch rain. This manual must be delivered to the customer with
the machine.
All safety and operating procedures reviewed
All hardware checked for tightness
Hitch connection to implement information reviewed
Field adjustment procedures reviewed
Lubrication information reviewed
Machine fully lubricated
Warranty information reviewed
PRE-OPERATIONAL CHECKLIST: