Table of Contents, continued
TP-6461 1/08Table of Contents
3.6.5 Solenoid Operation Diagrams, Model KSP Programmed-Transition Models
47
3.6.6 Solenoid Operation Diagrams, Model KGS Open Transition
Bypass/Isolation Switches 49......................................
3.6.7 Solenoid Operation Diagrams, 150--400 Amp Model KGP
Programmed-Transition Bypass/Isolation Switches 50.................
Solenoid Operation Diagrams, 150--400 Amp Model KGP
Programmed-Transition Bypass/Isolation Switches, continued 51.......
3.6.8 Solenoid Operation Diagrams, 600--3000 Amp Model KGP
Programmed-Transition Bypass/Isolation Switches 52.................
Solenoid Operation Diagrams, 600--3000 Amp Model KGP
Programmed-Transition Bypass/Isolation Switches, Continued 53......
Section 4 Controller Test and Replacement 55.................................................
4.1 User Interface Panel 55...................................................
4.1.1 Display 55......................................................
4.1.2 LED Indicators 55................................................
4.1.3 Lamp Test 56....................................................
4.1.4 Pushbuttons 56..................................................
4.2 Controller Circuit Boards and Connectors 57.................................
4.3 Controller Power 58......................................................
4.3.1 Controller Power Supply 58........................................
4.3.2 Controller Backup Battery 59......................................
4.3.3 Powering the Controller Directly (Service Kit GM52407) 59............
4.4 Sequence of Operation 60................................................
4.4.1 Controller Powerup Reset Sequence of Operation 60.................
4.4.2 Preferred Source Loss and Return 60...............................
4.5 System Test 61..........................................................
4.5.1 Unloaded System Test 61.........................................
4.5.2 Loaded System Test 61...........................................
4.5.3 Auto-Loaded System Test 61......................................
4.5.4 Test Procedure 61................................................
4.5.5 Test Sequence of Operation 64....................................
4.6 Exercise 66.............................................................
4.6.1 Exerciser Sequence of Operation 66................................
4.7 Engine Start 68..........................................................
4.8 Controller DIP Switches 69................................................
4.9 Calibration 70...........................................................
4.10 Position Microswitch Test 71...............................................
4.11 Programmed-Transition Interface Board 71..................................
4.12 File Transfer through the USB Port 72......................................
4.12.1 Configuration files 72.............................................
4.12.2 File Transfer 73..................................................
4.13 Controller Application Program 73..........................................
4.14 Controller Replacement 74................................................
4.14.1 Controller Configuration (Settings) 74...............................
4.14.2 [Circuit Board and Electronic Component Handling] 74................
4.14.3 Replacement Procedure 75........................................
Section 5 Component Replacement, Model KGS/KGP 79........................................
5.1 Introduction 79..........................................................
5.2 Contact Assembly Removal and Replacement 79............................
5.2.1 800--1200 Amp Models 79.........................................
5.2.2 1600--2000 Amp Models 81.......................................
5.2.3 3000 Amp Model 83..............................................
5.3 Auxiliary Switch Removal and Replacement 85
..............................