TP-6461 1/08 67Section 4 Controller Test and Replacement
Generator set engine start contacts close
Unloaded EXERCISE timer begins
Time delay engine cooldown
(as programmed*)
Generator set engine start contacts open
Exercise time period ends or
END button pressed
Load bank control output
activated (as programmed*)
Load bank control output
deactivated (as programmed*)
* See the Transfer Switch Operation and Installation Manual.
Generator set engine starts and the
standby source becomes available
Figure 4-11 Exercise without Load Sequence
Time delay preferred to standby and pre-transfer
load control time delays (as programmed*)
Post-transfer load control (as programmed*)
Transfer to standby source
Generator set engine starts and the
standby source becomes available
Load control contacts open
In-phase monitor or transfer to off (as programmed*)
Time Delay standby to preferred and Pre-transfer
load control time delays (as programmed*)
Post-transfer load control and engine
cooldown time delays (as programmed*)
Transfer to preferred source
Load control contacts open
In-phase monitor or transfer to off (as programmed*)
Loaded EXERCISE timer begins
Load control contacts close
Generator set engine start contacts open
Exercise time period ends or
END button pressed
Generator set engine start contacts close
Load control contacts close
* See the Transfer Switch Operation and Installation Manual.
Figure 4-12 Exercise with Load Sequence