EasyManua.ls Logo

KSB BoosterControl Advanced - 8 Commissioning;Start-Up;Shutdown; Ambient Conditions for Commissioning and Operation; Commissioning; Starting up the System

KSB BoosterControl Advanced
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8 Commissioning/Start-up/Shutdown
34 of 88
BoosterControl Advanced
8 Commissioning/Start-up/Shutdown
8.1 Ambient conditions for commissioning and operation
Table27: Ambient conditions for operation
Condition Value
Ambient temperature 0 ... 50 °C
Relative humidity 50 %
(non-condensing)
Installation altitude Max. 1,000m above MSL
(higher installation altitudes are subject to a
reduction factor)
8.2 Commissioning
A checklist can be used for commissioning. (ðSection12.1,Page81)
8.2.1 Starting up the system
See system documentation.
8.3 Setting BoosterControl Advanced
Note the general operating instructions. (ðSection6,Page21)
1. Select parameter 3-2-1-1.
2. Enter access level and associated password:
- Customer: 7353
Users logged in to BoosterControl Advanced are automatically logged off after 15
minutes of inactivity.
8.3.1 Setting the display language
1. Select parameter 3-1-1-1.
2. Select the language required and press "OK" to confirm.
8.3.2 Setting the time/date
BoosterControl Advanced does not automatically change between summer and
winter time.
1. To set the date, select parameter 3-7-1.
2. To set the time of day, select parameter 3-7-2.
8.4 Basic configurations of the pressure booster system
BoosterControl Advanced can be used for various operating modes of pressure
booster systems.
A set of preset parameters can be loaded for every operating mode.
The following operating modes are possible:

Table of Contents

Related product manuals