EasyManua.ls Logo

Kuka KR 350 - Page 18

Kuka KR 350
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation, Connection, Exchange
18 of 26
Ro/Me/03/23 03.99.02 en
Fig. 11 Transporting the robot for mounting on the ceiling
The procedure for mounting the robot on the ceiling (whether for the first time or as an
exchange) is as follows:
(1) Check that both locating pins (Fig. 8/2) and their fastening screws are undamaged and
fitted securely.
Damaged locating pins must be replaced by new ones.
The robot must be in the transport position (Fig. 12)*.
A1 A2 A3 A4 A5 A6
0˚
--40˚ +60˚ 0˚ +90˚
any
* Angle specifications
are referred to the
mechanical zero of
the axis concerned.
I
h
lh
KR 350/2 1690 2420
KR 350 L280/2 1780 2420
KR 350 L240/2 1960 2420
Fig. 12 Transport position for ceiling--mounted robots
(2) Raise the robot (Fig. 13/3) vertically with the fork lift truck and place it onto the ceiling
structure (5).

Related product manuals