(6) Remove eight M24x100--8.8 ISO 4017 hexagon bolts (1) together with lock washers.
(7) Lower robot slowly without tilting it.
The robot must be lowered vertically downwards until both locating pins are
free.
(8) Suspend robot in transport frame and if it needs to be turned over into the floor--mount-
ing position (base frame at bottom, arm at top), turn the robot together with the trans-
port frame.
If the robot is not to be reinstalled for some time, it must be protected against corrosion
before being put into storage.