EasyManua.ls Logo

Lattec Herd Navigator - Page 46

Default Icon
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
April 8, 2011 HN FAQ Memo, Version 2.0 Page 46 of 108
Once the CIP is requested the SI prepares for CIP. The SI fills the water containers and start
heating. Note that the heating can take about 15min. before the CIP process actually starts.
Step 3: While waiting for the heating to finish.
Place 2 suitable empty containers under the AI, and insert the 2 tubes from the AI. (as shown on
the picture)
The Container with the thin tube will collect the water flowing through the main line.
The container with the thick tube will collect the water flowing through the dosage needle.
Step 4:When the CIP starts, monitor the water flow in the 2 containers. The water starts flowing
from the main line (thin Tube) then switches to the dosage line (thick tube) and then switch back
to the main line.
Step 5:Measure the amount of water in each container using a suitable measuring cup.
Dosage line
Main line

Table of Contents