To install the operator panel tray assembly, complete the following steps:
Watch the procedure. A video of the process is available:
• Youtube:
https://www.youtube.com/watch?v=pIb0bIyfkDY&=PLYV5R7hVcs-Ak9fT8QAx8fLbEivizjRtp
• Youku: http://v.youku.com/v_show/id_XMzMyODU3NTY2NA==.html?spm=a2hzp.8253876.0.0&f=51276390
Step 1. Align the top and bottom of the operator panel tray assembly with the slot in the front of the server,
insert the tray assembly into place and fasten the screw to secure it.
Figure 86. Operator panel tray assembly installation
Step 2. Connect the front operator panel cable and USB cables to the system board.
Figure 87. USB 2.0 cable and front operator panel cable
Table 49. USB 2.0 cable and front operator panel cable
1 USB 2.0 cable
2 Front operator panel cable
After installing the operator panel tray assembly, complete the following steps:
94
ThinkSystem SR860 Maintenance Manual