Contents
i3
5.6 First commissioning with the 8230 frequency inverter BDE control unit 148
5.6.1 Language Select 148
5.6.2 Ratings 149
5.6.3 Control structure 152
5.6.4 Speed adjustment/speed limit 152
5.6.5 Field weakening 152
5.6.6 Multiple motor operation/Group supply 153
5.6.7 Motor potentiometer function 154
5.7 Terminal strip wiring 154
5.8 Configuring the drive 156
5.9 Demand selection 157
5.10 Control structure 158
5.10.1 Frequency control 158
5.10.2 Control without encoder 158
5.10.3 Control with encoder 159
6 Help in the event of errors 160
6.1 First value log for error messages 160
6.2 Switching sequence on errors 160
6.3 Event log 160
6.4 Events 160
6.5 Error log 163
6.6 Errors 163
7 Maintenance 167
7.1 Battery for RAM and clock 167
7.1.1 Battery change 167
7.1.2 Technical data of battery 167
7.2 Fans 167
7.3 Power connections 167
7.4 Reforming the link capacitors 168
Declaration of Conformity AAS-KE 001/9.95 170