Technical Data
62 BA8230
Fig. 32: Layout of BDE in the door (Cubicle earthed against HF)
Note:
When the control unit is installed in the cubicle door it is essential that the door hinges
are bridged with straps to conduct HF.
Any paint on the contact points between the support frame and the door panel must
be removed. We recommend the control unit should also be earthed to the frame
using an earth strap
1)
, e.g. copper plate 20 x 0.15 mm.
In protection classes ≥ IPx3 the contact surface
2)
of the BDE is to be sealed with 1K
sealant.