EasyManua.ls Logo

Lenze i500 Series

Lenze i500 Series
28 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
Teachware i500 - Application case - DOC 2338864 - DE EN 11.2019 21
EN
3. Commissioning
It is only permissible to commission the teachware in a dry and clean environment.
Open the case lid and place the teachware with the controls facing forwards on a solid, even
base. The base must be suitable for absorbing the forces and torques occurring during operation.
Make sure that nothing can fall and that there is no danger of crushing.
Ensure that there is enough space in front of the teachware so that the control panel are freely
accessible and there is room for the switching systems including wiring and, if necessary, for fur-
ther components and your documents. Place the case lid beside the teachware in order to have
all the available components ready to hand.
3.1. Before initial switch-on
Before each commissioning, check whether
… the motors and flywheels as well as all other mechanical components are fixed safely.
… all screw connections of the electrical parts are tightened firmly.
Danger!
All electrical connections must only be made, disconnected and changed in a de-
energized state.
Warning:
Drive pulley rotate
during operation!
XS2 Speedtec plug
(Motor)
Switching system IO
Sub-D connector
for IO
S1 (Supply 230 V)
S2 (Supply 24 V)
XS1 Speedtec socket
(Inverter)
T1, T2 Inverter
i550, i510
M1 Motor MDEMA
X1 Encoder connector
Gripping points for
control unit replace-
ment on i550

Other manuals for Lenze i500 Series

Related product manuals