EasyManua.ls Logo

Lenze L-force PROFINET E94AYCER - External Voltage Supply

Lenze L-force PROFINET E94AYCER
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Electrical installation
External voltage supply
EDK94AYCER DE/EN/FR/ES/IT 6.1
44
H2_ext_SpannVersorg−Steckerleiste_Federkraft
External voltage supply
Note!
In the case of an external voltage supply and for greater distances between the
control cabinets, always use a separate power supply unit (SELV/PELV) that is
safely separated in accordance with EN 61800−5−1 in each control cabinet.
The external voltage supply of the communication module is necessary if PROFINET
communication is to continue in the event that the power supply to the standard device is
cut off.
Supply the communication module via the 2−pole plug connector (X240) with a separate
supply voltage.
Designation Description
+ External voltage supply
U = 24VDC(20.4 V... 28.8 V)
I = 130 mA
Reference potential for external voltage supply
Terminal data
Field Values
Electrical connection 2−pin plug connector with spring connection
Possible connections
rigid:
1.5 mm
2
(AWG 16)
flexible:
without wire end ferrule
1.5 mm
2
(AWG 16)
with wire end ferrule, without plastic sleeve
1.5 mm
2
(AWG 16)
with wire end ferrule, with plastic sleeve
1.5 mm
2
(AWG 16)
Stripping length 9 mm

Table of Contents

Related product manuals