EasyManua.ls Logo

LINET AVE 2 - Un-Packing Manual

LINET AVE 2
69 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
3 Un-packing Manual
Inspection of the consignment after delivery
Do not unpack and/or accept the consignment if the package has any visual damage! If so, issue a
complaint.
Personal qualification
The persons authorised for installation and putting into operation of the product, i.e. those trained by Linet
s.r.o.
Personnel required for unpacking and installation
Minimum two persons.
Anticipated time
Anticipated time of unpacking is 30 minutes, anticipated time of installation is 30 minutes.
Necessary tools and materials
Set of Allen wrenches, Phillips screwdriver /electric screwdriver, scissors/ knife, blue Loctite 243, 2x
polystyrene ramps are included, wrench 17.
Required working space
When unpacking, overall table dimensions should be considered. Recycle used packaging materials. We
recommend unpacking and installation be made in the goods receiving department. For unpacking
operations, observe minimum 0.8m on the sides of the pallet and minimum 2.6m in front of the pallet (i.e.
minimum space for unpacking 2.8x5.2m).
Sequence of instructions
Cut the pockets with the user guide to the chair open carefully and take them out. Then remove the box.

Table of Contents

Related product manuals