Lucent Technologies Round Cell Batteries
Issue 3 December 1999 Ordering Information 3 - 7
Battery Stands, continued
Earthquake
Bracing of
KS-20760 Battery
Stands
Table 3-G: Guidelines for Earthquake Bracing
of KS-20760 Battery Stands
Battery Stand
Arrangement
for All
KS-20472
Batteries
(Note 1)
Earthquake Zones
1 234
Ground
Floor and
1st Floor
Above 1st
Floor
Ground
Floor and
1st Floor
Above 1st
Floor
All Floors All Floors
1-Tier
2-Row
NR EQS (Note 7)
2-Tier
1-Row
EQS
(Note 2)
EQS
(Notes 5, 6)
EQS
(Notes 4, 5, 9)
2-Tier
2-Row
NR
EQS
(Note 7)
EQS
(Note 5)
EQS
(Notes 5, 6
3-Tier
1-Row
EQS
(Notes 2, 4)
EQS
(Notes 3, 5, 6)
R
3-Tier
2-Row
NR
EQS
(Note 5)
EQS
(Notes 7, 8)
EQS
(Notes 5, 6)
EQS (Notes 3, 5, 6)
4-Tier
1-Row
EQS
(Notes 2, 4)
EQS (Notes 4, 5)
EQS
(Notes 4, 5, 9)
R
4-Tier
2-Row
NR
(Note 3)
EQS (Notes 3, 5)
EQS
(Notes 3, 5, 6)
EQS
(Notes 4, 5, 9)
R
Key:
NR = No requirements for earthquake bracing.
R = Restricted. DO NOT USE in designated earthquake zones.
EQS = Earthquake modifications per KS-20760 arranged per ED-82563.
Notes:
1. KS-20472 Round Cells Only.
2. Attach to building wall per ED-82563-10.
3. Applies to KS-20472, List 2S, 3S, and 4S only. Do not use List 1S.
4. Applies to KS-20472, List 3S and 4S only. Do not use List 1S and 2S.
5. Earthquake hold-down assembly required.
6. Joints must be epoxied if KS-20472, List 1S or 2S cells are used.
7. Steel Base retainers required.
8. Earthquake hold-down assembly required for KS-20472, List 1S and 2S.
9. Joints must be epoxied.