3. BASIC REQUIREMENTS, OPERATIONAL
SAFETY
In the safety service scope, the controller meets to requirements of the
EN 61010-1 standard.
Observations Concerning the Operational Safety:
All operations concerning transport, installation, and commissioning
as well as maintenance, must be carried out by qualifi ed, skilled
personnel, and national regulations for the prevention of accidents
must be observed.
Before switching the controller on, one must check the correctness
of connections to the network.
Do not connect the controller to the network through an autotransformer.
The removal of the controller casing during the guarantee contract
period may cause its cancellation.
The controller fulfi lls requirements related to electromagnetic compa-
tibility in the industrial environment
When connecting the supply, one must remember that a switch
or a circuit-breaker should be installed in the room. This switch should
be located near the device, easy accessible by the operator,
and suitably marked as an element switching the controller off.
Non-authorized removal of the casing, inappropriate use, incorrect
installation or operation, create the risk of injury to personnel or meter
damage.
For more detailed information, please study the User’s Manual.
4. INSTALLATION
4.1. Controller Installation
Fix the controller in the panel, which the thickness should not
exceed 15 mm, by means of four screw clamps acc. to the fi g. 1.
The panel cut-out should have 45
+0.6
x 45
+0.6
mm.