For additional information, see the complete installation and operation guide at www.lutron.com/qs
GRAFIK Eye QS with DALI® Control Unit Quick Installation and Operation Guide
14
DALI® Setup
After DALI® devices are wired and powered, they must be addressed before the
system can control them. The “Build System” command automates this process.
Note: All existing DALI® programming will be deleted when the “Build System”
command is run, including DALI® sensor programming on the GRAFIK Eye
QS control unit.
Building the System
1. Enter programming mode.
2. Use the Master buttons to highlight “DALI” and press the
OK button to accept.
3. Use the Master buttons to highlight “Build system” and
press the OK button to accept.
4. Press the OK button to erase all current programming,
reset and address DALI
® devices, and find sensors on the
system.
5. Exit programming mode.
Note: After running “Build System”, Zone 4 will control
all DALI® devices for diagnostics and verification
of wiring. (This feature is disabled once any of
the addressed devices are assigned to a zone on
the GRAFIK Eye QS control unit.) Use the Zone 4 raise/lower buttons to verify that all devices are correctly
addressed. If a device does not respond, repeat the “Build System” command and/or check the wiring.
Main Menu
Zone Setup
DALI
DALI
Build System
Assign Zones
Searching…
×
Found
× Loads
Found
Build system
Erase Digital Load
Programming?
OK
16
9-16
1-8
Master buttons
OK button
Timeclock (back)
button
12
3
4
5