EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove YB5515-2

Manitowoc Grove YB5515-2 User Manual

Manitowoc Grove YB5515-2
152 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #111 background imageLoading...
Page #111 background image
GROVE Published 1-20-2017, Control # 468-02 6-3
CD5515-2/YB5515-2 OPERATOR MANUAL MAINTENANCE
6
by a qualified person. This person should use the daily
through monthly inspections.
A crane which has been idle for a period of over 6 months
must be given a complete inspection covering all inspections
through one year, by a qualified person.
Standby cranes must be inspected using the daily through
monthly inspection, by a qualified person.
PREVENTIVE MAINTENANCE
Maintenance Schedule and Checklist
NOTE: Hour intervals in each maintenance chart show the
correct time for service. The hourmeter located in
the operator’s cab indicates the total hours the
crane has been running.
In addition to the following scheduled maintenance,
perform the scheduled maintenance suggested in
the engine manual furnished with the crane.
When performing maintenance, do the required
maintenance interval as well as all previous interval
maintenance. For example, when performing the
250 hour (monthly) maintenance interval, perform
all the tasks required for daily, 50 hour and 100
hour maintenance.
Reference Only

Table of Contents

Other manuals for Manitowoc Grove YB5515-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove YB5515-2 and is the answer not in the manual?

Manitowoc Grove YB5515-2 Specifications

General IconGeneral
BrandManitowoc
ModelGrove YB5515-2
CategoryConstruction Equipment
LanguageEnglish

Related product manuals