Lubrication Points
Apply grease to the following fittings after the first 20 hours of
operation, thereafter every 50 hours of operation, whichever
occurs first. Use a Lithium Base, E.P. No. 2 bearing grease or
equivalent. Apply enough grease to remove the old grease.
Booms and Main Frame
Location QTY
Mast Bearing (see Figure 6-1) 2
Boom Pivot (see Figure 6-2) 2
Boom Head Sheaves and Pivot (see Figure 6-3) 2
Lift Cylinder Pivots (see Figure 6-5) 2
Drive Train
Location QTY
Steering Knuckles- front axle (see Figure 6-6) 4
Steering Knuckles- rear axle (see Figure 6-7) 4
Steering Link- front axle (see Figure 6-8) 2
Steering Link- rear axle (see Figure 6-9) 2
Steering Cylinder Pivot Ends- front axle (see Figure 6-10) 2
Steering Cylinder Pivot Ends- rear axle (see Figure 6-11) 2
Rear Axle Pivot (see Figure 6-12) 2
Optional Equipment and Accessories
Location QTY
Drop Block (see Figure 6-13) 2
Boom Extension Head Sheave (see Figure 6-14) 1
Boom Extension Deflector Sheave (see Figure 6-15) 1
Reference Only

Table of Contents

Other manuals for Manitowoc Grove YB5515-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove YB5515-2 and is the answer not in the manual?

Manitowoc Grove YB5515-2 Specifications

General IconGeneral
BrandManitowoc
ModelGrove YB5515-2
CategoryConstruction Equipment
LanguageEnglish

Related product manuals