GROVE Published 1-20-2017, Control # 468-02 6-5
CD5515-2/YB5515-2 OPERATOR MANUAL MAINTENANCE
6
-Maintenance should be performed using either the hourly or calendar dates, whichever occurs first.
-Under extremely dusty conditions,(*) items may require replacement more frequently.
Check axle wheel hub lubricant level (4)
x
Check axle housing lubricant level (2)
x
Check Hoist gearbox and brake lubricant
level
x
Lubricate the outrigger slides
x
Add grease to swing gearbox
x
Replace fuel filter elements
x
Inspect the parking brake pads
x
Inspect tires for damage
x
Add rust inhibitor to engine cooling
system
x
Replace the air cleaner element *
x
Check swing gear to pinion backlash
x
Replace the transmission oil and filter
x
Replace the axle wheel hub lubricant
x
Replace the axle housing lubricant
x
Replace the hoist gearbox lubricant
x
Replace the hydraulic oil
x
Replace the hydraulic oil filter
x
Check coolant for contamination
x
Replace the engine coolant
x
Inspect the crane structure and booms for
damage
x
Test the Rated Capacity Limiter (RCL)-
optional
x
Service Check
Daily
before
operation
50
Hours
Weekly
100
Hours
Two
Weeks
250
Hours
Monthly
500
Hours
Three
Months
1000
Hours
Six
Months
2000
Hours
Yearly
Reference Only

Table of Contents

Other manuals for Manitowoc Grove YB5515-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove YB5515-2 and is the answer not in the manual?

Manitowoc Grove YB5515-2 Specifications

General IconGeneral
BrandManitowoc
ModelGrove YB5515-2
CategoryConstruction Equipment
LanguageEnglish

Related product manuals