EasyManuals Logo

Metrohm FOSS NIRS XDS MultiVial Analyzer User Manual

Metrohm FOSS NIRS XDS MultiVial Analyzer
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #87 background imageLoading...
Page #87 background image
▪▪▪▪▪▪▪
85
After each standard is run, Vision plots the
comparison for each wavelength area as
shown. Tolerances are automatically applied,
and a “Pass” or “Fail” indication is given.
Continue to follow the on-screen prompts for
each standard. Vision requests the 40%,
20%, 10%, and 2% standards.
When Vision has completed the test, the
tabulated results may be printed. They are
also stored in the Diagnostic Database for
later recall.
Note the tab marked “USP Test”. Click on this
tab to see the USP-recommend plot and
summary report. These are shown on the
next page. (Note that this test is de-
emphasized as of December 1, 2008.)
When the test is complete, click “Print
Results” for a hard-copy report. Click “Close
Window” when finished.
If the photometric scale of the instrument has drifted, or if
the instrument is not fully warmed up, the user may see this
message.
Photometric Test is a good check of Reference
Standardization. If Reference Standardization needs to be re-
run, this message will be shown. Re-run Reference
Standardization. If required, run Photometric Test again to
verify that the photometric scale of the instrument is now
reading properly.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Metrohm FOSS NIRS XDS MultiVial Analyzer and is the answer not in the manual?

Metrohm FOSS NIRS XDS MultiVial Analyzer Specifications

General IconGeneral
BrandMetrohm
ModelFOSS NIRS XDS MultiVial Analyzer
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals