EasyManua.ls Logo

Micromeritics TriStar II 3020 - 3. OPERATING PROCEDURES; Specifying Sample Defaults

Default Icon
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TriStar II 3020 Scheduled Maintenance Instructions Operational Verification
Jun 09 29
Operational Verification
Performing a Blank Analysis
1. Install blank tubes with filler rods and isothermal jackets into each of the sample ports.
Be sure to use new O-rings on the sample tubes. Make sure the Dewar cover is attached.
(Verify that the isothermal jacket and filler rods are checked as being used in the sample
tube file.)
2. Fill the Dewar with LN
2
and check the level using the dipstick.
O-ring
Ferrule
Sample port nut

Other manuals for Micromeritics TriStar II 3020

Related product manuals