EasyManua.ls Logo

Miele PG 8581 - Peak-Load Negotiation and Load Management

Miele PG 8581
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electrical connection
*INSTALLATION*
133
Peak-load negotiation
The machine is suitable for use in an energy management system. For
this purpose, it must be technically adapted and the controls reset by
Miele Service.
Please contact Miele Service for further information.
Load manage-
ment
In the event of a peak-load negotiation, some machine components
such as the heater element will be switched off for a while. The ma-
chine will remain on during this period and the current program will
not be interrupted. If one of the components that is switched off is
needed during the current program stage, the program cycle time will
simply increase for the duration of the load cut-out.
The third line of the display will alert you to the load cut-out, for ex-
ample:
Vario TD Dental
Temperature
Peak load cut-out
55°C

Table of Contents

Other manuals for Miele PG 8581

Related product manuals