MM063-010 – Operator Manual
36
At the end, reposition the drain valve vertically.
Now the new reagent can be loaded inside the unit.
3)Connect the end of the tube to a container. Open the drain valve, placing it in a horizontal position by
rotating it 90 ° and let the reagent flow into an empty container (which must be provided by the user) suitable
for housing 13 L of reagent.
Milestone recommends switching the unit OFF if you do not immediately insert the new
reagent inside the unit or press STOP HEATING icon.