EasyManua.ls Logo

Milestone HistosMATE - Page 36

Default Icon
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HistosMATE
MM063-010 – Operator Manual
36
At the end, reposition the drain valve vertically.
Now the new reagent can be loaded inside the unit.
3)Connect the end of the tube to a container. Open the drain valve, placing it in a horizontal position by
rotating it 90 ° and let the reagent flow into an empty container (which must be provided by the user) suitable
for housing 13 L of reagent.
Milestone recommends switching the unit OFF if you do not immediately insert the new
reagent inside the unit or press STOP HEATING icon.