EasyManua.ls Logo

Miller ENPAK - Installation; Installing Unit

Miller ENPAK
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OM-261050 Page 23
SECTION 6 − ENGINE PREPARATION
6-1. Connecting the Battery
265 802-A / 287 097-B
1/2 in.
Tools Needed:
! Route battery cables
away from hot, sharp, or
moving parts.
! Connect negative (−)
cable last.
1 Battery Cable Strain
Relief
2 Starter
3 Starter Cable Lug
(Supplied)
4 Engine Block
Route cables from vehicle bat-
tery through strain relief.
Crimp supplied starter cable
lug onto positive (+) cable.
Connect positive (+) cable to
engine starter.
Locate hole in engine block
behind unit center upright.
Connect negative (−) cable to
engine block.
Battery Specification:
12 V, 650 CCA at 0° F
Battery Cable Specification:
1/0 AWG
1
1
3
2
4

Table of Contents