EasyManua.ls Logo

Miller PRO 300 - 5-6. Engine Prestart Checks

Miller PRO 300
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OM-4422 Page 20
5-2. Mounting Welding Generator
Tools Needed:
9/16 in
2
2
3
4
Welding Unit In Place
Bolting Unit In Place
Do not weld on base. Weld-
ing on base can cause fuel
tank fire or explosion. Weld
only on the four mounting
brackets or bolt unit down.
Do not mount unit by sup-
porting the base only at the
four mounting brackets.
Use cross-supports to ade-
quately support unit and pre-
vent damage to base.
Mounting Surface:
1 Cross-Supports
2 Mounting Brackets (Supplied)
Mount unit on flat surface or use
cross-supports to support base.
Secure unit with mounting brack-
ets.
3 1/2 in Bolt And Washer
(Minimum − Not Supplied)
4 3/8-16 x 1 in Screws
(Supplied)
To Bolt Unit In Place:
Remove hardware securing the
four mounting brackets to the base.
Reverse brackets and reattach to
base with original hardware.
Mount unit to truck or trailer with 1/2
in (12 mm) or larger hardware (not
supplied).
To Weld Unit In Place:
Weld unit to truck or trailer only at
the four mounting brackets.
1
Inadequate support.
2
Supporting The Unit
Using Mounting Brackets
install3 6/04 803 274 / 190 250-A / 803 231
Do not use flexible mounts.
1
OR

Table of Contents