Emergency Procedure in Multi-system configuration
When your primary system is not operational, the first auxiliary system can be converted
to a primary to continue production of purified water.
Procedure
Important: This emergency procedure is as temporary way to ensure continuity of
production. During the emergency procedure, the consumables and actuators
lifetime on the Distribution part are not managed by a system. Call your Service
representative to get your primary system up and running.
1. Power off the primary system using the main switch on the system backpanel.
2. From the primary system backpanel, disconnect the three external connectors (C1,
C2 Out and CH In) . The cable CH Out can be left in place.
Note: If the distribution is not duplex, C2 Out is not present.
3. Connect the three external connectors to the backpanel of the first auxiliary system l.
The first auxiliary will become the temporary primary system.
4. On the first auxiliary system, from the Overview screen on the MMI, press the three
horizontal bars on the distribution top right panel to activate the distribution.
Before After