Page 8 of 32
Optional: to arrange the tubing and
electrical cable in your working area, use
the Milliflex Oasis
®
guides for electrical
cable and tubing (item MMTUGUIDE).
Figure 10: use of Milliflex Oasis
®
guides for
electrical cable and tubing (item MMTUGUIDE)
• Sanitize the internal flow of the pump by
referring to the cleaning & maintenance
section
• Once the internal flow path sanitization
has been performed, take the two pump
heads out of their package and remove
the yellow covers
Optional: From the accessory bag, select
two colored rings, clean them using a wipe
and one of the sanitizers recommended in
the cleaning & maintenance section, then
install them on the pump heads.
Figure 11: colored ring installation — part 1
Figure 12: colored ring installation – part 2
• Clean the pump heads using a wipe
moistened with a surface sanitizer listed
in the cleaning & maintenance section
• Install the pump heads on the pump body
• Lock each pump head by turning
clockwise until the sign on the head is
aligned with the one on the pump body
Figure 13: the sign on a locked head is aligned
with the one on the pump body
The pump is ready for testing.