3Setup instructions
3.1Device overview
ItemDescription
1Load plate
2Manufacturer's ID label
3Four leveling feet
4Level indicator
5Connection cable port
6Power supply (optional)
7Menu access switch (behind the cover screw)
3.2Requirements on location
Set up a suitable installation location for the weighing platform:
-The installation location should be dry, level and at.
-The operating temperature range is between 0°C and +40°C.
-The weighing platform must not be subjected to unnecessarily extreme
temperatures, moisture, impacts or vibrations that could result in damage.
3.2.1Bellow-cell weighing
A below-cell weighing port is available on the bottom of the weighing platform.
.Unscrew the plugs on the bottom of the weigher.
ISEDE‑16‑34‑64‑H(V1) | ISEDE‑16‑34‑HCE | ISEDE‑64‑S(V1) | ISEDE‑64‑SCE3 Setup instructions
Minebea IntecEN-8