24. Checking for proper installation and conducting commissioning
242
WT09991X01
24. Checking for proper installation and
conducting commissioning
24-1. Checking for proper installation
• The controller must be installed by the dealer (or the contractor) in accordance with the applicable laws,
regulations, and certifications.
• Attend the commissioning to be conducted by the dealer (or the contractor).
• Receive instructions on the correct usage from the dealer (or the contractor) to ensure safety.
• When the installation work is completed, check the following items yourself.
24-2. Commissioning
• Before the commissioning for the controller is conducted, a test run for the indoor units must be completed.
For details, refer to the installation manual for the indoor units.
The following checks must be conducted to make sure that the initial settings of the controller are correct
and that the air-conditioning system is configured properly.
(1)
Start and stop the indoor units from the AE-C, and make sure the indoor units operate accordingly.
(2)
Start and stop the indoor units from the local remote controller, and make sure the correct operation
statuses appear on the AE-C.
(3)
Perform items (1) and (2) for all indoor unit groups.
Important
• Conduct a test run for each group. Incorrect initial settings (e.g., incorrect group settings) for the controller
can result in operation problems (e.g., target/non-target indoor units do not operate or stop as intended).
Note
• Item (2) can be skipped when testing a system without local remote controllers.
• EW-C needs to be operated from the Web browser.
24-3. Backup of setting data
Be sure to back up the initial settings in case of a failure or problem of the controller.
Tap [Maintenance] on the Panorama view screen and log in, and the operation management screen will be
displayed.
Tap [Utilities]-[Back up/import settings data] to display the Back up/import settings data screen to make a
backup of setting data.
Check item
Check-off
column
Did you receive instructions on safety precautions?
Did you receive instructions on operation procedures and correct usage to ensure
safety?
Did you make sure that the items listed on the installation work checklist of the
Installation Manual are checked off?
Did you receive instructions on the initial settings?
Did you receive a report on the commissioning result?
Did you attend the commissioning?
WT09991X01 英語IB詳細編 (3校 正式版).book 242 ページ 2024年7月30日 火曜日 午後3時34分