EasyManua.ls Logo

MMM CLIMACELL 111 - 12 WARRANTY AND SERVICE; 13 TRANSPORT AND STORAGE; 14 WAY OF LIQUIDATION

MMM CLIMACELL 111
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Instructions for use
44 CLIMACELL EVO_np_en_1401_mmm_V1.01
In case of contaminated material leakage to the
chamber of the device, the user is responsible for
appropriate performance of decontamination of all and
any contaminated surfaces with suitable and approved
disinfection means.
Before using any other method of cleaning or
decontamination than the methods recommended by us it is
purposeful for the user to check at the manufacturer that the
method could not do any harm to the device.
Waste vessel dismantling – according to arrows
(1) – Male / female connector (pump and level switch
feeding), (2) – Vessel for waste water (with a pump, level
switch and hose).
Fig. 79
10.6 STEAM GENERATOR
It is located in the rear part of the device, below the cover.
Check hose tightness only, the other parts of the generator
will be checked by a service technician. It should be
performed at least once per year.
10.7 REVISION OF ELECTRO PARTS
The temperature engineering cases are designed for basic
standard environment, the manufacturer recommends the
revision period of 1 year, unless set otherwise by local
regulations.
In case of the case to be placed in different environment,
the revision must be performed in compliance with local
standards.
The service inspection is a matter of agreement by and
between the client and service organisation.

Table of Contents