EasyManua.ls Logo

Moeller MI4 - Data Plug Earthing; Earthing the 0 Volt Cable; Panel Housing Earth Connection; Power Supply Plug Earth Connection

Moeller MI4
81 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connections
11
12/03 AWB-C27-1293GB
Earthing the 0 volt cable (see Fig. 1)
The units can be operated earthed or unearthed. An
isolation monitoring device must be used for
unearthed operation.
Panel housing earth connection
The panel housing must always be earthed. The
earth connection is located next to the connector
sockets for the power supply. It is indicated by a
sticker bearing the symbol for earth. Use a 6.3 mm
fast-on plug for the power connection.
Power supply plug earth connection
In all cases, connect the earth connection of the plug
to earth. It is connected internally to the 0 V plug
connection through a capacitor-resistor combination
(10 nF, 100 V/1 M).
Data plug earthing
The data plug housings for MI4 units are earthed.

Table of Contents

Other manuals for Moeller MI4

Related product manuals