Initialization Check
To determine if the system is initializing correctly, only the first
chassis, GCD-CP10, one GGCD-8DLCA, and
terminals should be
installed on the system. After initialization, all the terminals assigned
to the GGCD-
8DLCA can be used for internal calls to one another. (By
default, these stations are assigned station
numbers 200~207).
System Initialization
Before initialization is performed and verified, the entire system should be
initialized.
With power OFF, all interface and option cards can be installed in the
controlling chassis. The technician
can then power up the system to perform
a First Initialization. After the initialization, each station display
shows default
time and date indications.
For example: 12-2 Fri 10:47 AM
After Initialization
Ensure that the battery is installed in CN15 on the GCD-CP10.
Check all blade slots in software to ensure the initialization process scanned
the installed hardware
correctly.
A general system operation check should be performed using default values
prior to system programming.
After all previous steps are performed and any problems corrected, system
programming is complete.
After System Programming is finished, the technician should perform a
Second Initialization. Performing the
First Initialization a second time causes
all programming memory to be lost. Second Initialization refreshes
the system
RAM without losing any memory.
This completes the installation procedure for the UNIVERGE SV9100 system.
The technician should check
the operation of each Multiline Terminal to
ensure the system is working properly.